'

Search results

Found 904 matches
Worksheet 341

The awe‐inspiring Great Pyramid of Cheops was built more than 4500 years ago. Its square base, originally 230 m on a side, covered 13.1 acres, and it was 146 m high (H), with a mass of about 7×10^9 kg. (The pyramid’s dimensions are slightly different today due to quarrying and some sagging). Historians estimate that 20,000 workers spent 20 years to construct it, working 12-hour days, 330 days per year.

a) Calculate the gravitational potential energy stored in the pyramid, given its center of mass is at one-fourth its height.

Division
Potential energy

b) Only a fraction of the workers lifted blocks; most were involved in support services such as building ramps, bringing food and water, and hauling blocks to the site. Calculate the efficiency of the workers who did the lifting, assuming there were 1000 of them and they consumed food energy at the rate of 300 Kcal/hour.

first we calculate the number of hours worked per year.

Multiplication

then we calculate the number of hours worked in the 20 years.

Multiplication

Then we calculate the energy consumed in 20 years knowing the energy consumed per hour and the total hours worked in 20 years.

Multiplication
Multiplication

The efficiency is the resulting potential energy divided by the consumed energy.

Division
General Logistic Sigmoid Function

A logistic function or logistic curve is a common “S” shape (sigmoid curve). Data that follows an increasing logistic curve usually describes ... more

Binoculars range (distance to an object)

Binoculars, field glasses or binocular telescopes are a pair of identical or mirror-symmetrical telescopes mounted side-by-side and aligned to point ... more

Process Capability Index - Cp,upper

In process improvement efforts, the process capability index or process capability ratio is a statistical measure of process capability: the ability of a ... more

Diffusion Coefficient for two different gases (related to Fick's laws)

Diffusion is the net movement of a substance (e.g., an atom, ion or molecule) from a region of high concentration to a region of low concentration. For two ... more

Normalized water content ( effective saturation van Genuchten)

In soil mechanics and petroleum engineering, water content or soil moisture content is the quantity of water contained in the soil. The normalized water ... more

Sersic profile (in terms of the half-light radius, Re)

The Sérsic profile (or Sérsic model or Sérsic’s law) is a mathematical function that describes how the intensity I of a galaxy varies with distance ... more

Volumetric water content

Water content or moisture content is the quantity of water contained in a material, such as soil (called soil moisture), rock, ceramics, fruit, or wood. ... more

Direct mesurement of the Volumetric Water content

Water content or moisture content is the quantity of water contained in a material, such as soil (called soil moisture), rock, ceramics, fruit, or wood. ... more

Hydraulic conductivity (as a function of water)

By definition, hydraulic conductivity is the ratio of velocity to hydraulic gradient indicating permeability of porous media.

Civil engineers ... more

...can't find what you're looking for?

Create a new formula